Monthly Archives: July 2012

Weeks Twenty-four to Twenty-eight

Got seriously behind with this – sorry.  So four weeks in one.  The plastering – and odd bits of plasterboarding/tacking – press steadily on.  This is taking very much longer than originally expected, largely because there’s only one person doing … Continue reading

Posted in Cladding, Electrics, Solar PV, Ventilation, Windows | Comments Off on Weeks Twenty-four to Twenty-eight

Weeks Twenty-two and Twenty-three

The insulation lorry arrived.  The contains two generators to drive the machine, built into the truck, which fluffs up the Warmcel 500 and then blows it along large bore flexible pipes into the house.  A disc of plasterboard is cut … Continue reading

Posted in Uncategorized | 2 Comments